JAMES E. FERRIS, B.Sc. Eng., MCSE
A PROJECT ENGINEER who has special expertise in drainage works and solid experience from various types of municipal, civil, and industrial projects by way of consulting companies.
Employment Experience
| February to May 1995 |
Drainage Engineer | N.D. Lea Consultants Ltd. Vancouver, B.C. | June to November 1994 |
Municipal Designer | H.Y. Engineering Ltd. Surrey, B.C. |
July 1991 to August 1992 |
Municipal Engineer | Reid Crowther & Partners Ltd. Burnaby, B.C. |
July 1989 to November 1990 |
Municipal Engineer | Reid Crowther & Partners Ltd. Edmonton, Alberta |
September to November 1988 |
Inspector, Contract | Torchinsky Engineering Ltd. Sherwood Park, Alberta |
May to November 1987 |
Project Engineer, Contract | Wardrop Alberta Ltd. Edmonton, Alberta |
June 1985 to October 1986 |
Project Engineer | GPEC Consulting Ltd. Hay River, N.W.T. |
November 1979 to February 1982 |
Junior Engineer | Assoc. Engineering Services Ltd. (AESL) Industrial Division Edmonton, Alberta |
Education and Professional Affiliations
Example Project List
| Project Management Road Works |
Design and Contract management | Moscrop / Gilpin Connector Burnaby, BC, 1991-1992 | 2.0 km bypass road through park lands; develop detail design for staged pre-load, road laning, and for storm runoff management; assist with project management and cost control; estimate consulting and capital costs; develop contract drawings, documents and specifications; supervise drafting, and construction survey and inspection; coordinate sub-consultants; perform contract administration.
|
Design Road Works |
Preliminary design | 1.7 km road upgrading Burnaby, BC October, 1991 to January, 1992 |
develop conceptual design for upgrading of industrial connector in Fraser River flood plain area including roadworks and pre-loading, relocation of all utilities, and design for overland drainage.
|
Design Sanitary Facilities |
Design, sewage system | Caslan, Alberta October, 1989 to June, 1990 |
develop detail design for sewage detention ponds with conceptual examination of alternate draining systems via overland ditching or via spray irrigation.
|
Design Storm Management |
Design, drainage and utilities impact for provincial highway |
Island Parkway, B.C. 1995 |
develop detail drainage model and design for proposed provincial highway in the vicinity of North Nanaimo and Lantzville using MIDUSS software, including analysis for storm runoff and environmental road runoff detention; design for water and sewer highway crossing features as required for existing and future services.
|
Design Stream Works |
Design, creek realignment | Byrne Creek, Burnaby, BC January to February, 1992 |
develop detail design for conceptual analysis, and coordinate government agency approvals.
|
Design Subdivision and Area Planning |
Design, 1 to 6 lot residential subdivisions |
Burnaby and Surrey, B.C. June to November, 1994 |
develop subdivision design packages for submission to local municipal authorities, complete with lot grading plan, local road improvement design, storm water control plan and local design, sanitary sewer main loading and local design, water and fire protection servicing design, and analysis of planned development relating to other utilities.
|
Design Water Supply Systems |
Analyze regional water supply system |
Nanaimo Regional District, B.C. fall, 1991 |
compose and tabulate data from design teams for intake, reservoir, pump, storage, treatment, and circulation components of alternate systems including factoring for maintenance and lifecycle costing. assist with analysis of resulting cost models.
|
Design Industrial Site |
Design and Supervise construction 200 ha. sawmill site |
Grande Cache, Alberta 1979 to 1981 |
develop conceptual design for site and for access; develop detail design for 2 km access road and internal loop road, for site drainage, and for 1 km rail siding; develop recommendation of log handling systems; develop contract drawings, documents and specifications, perform contract administration; survey for and supervise construction.
|