Conversion Progress

Here is our bus at Rainbow Coach.  The windows have been blanked out and cutouts made for the new windows.

The interior walls are being framed prior to foaming. Shot of the framing on the ceiling

 

The interior of the bus with spray foam finished and Les trimming the foam.

 

The bedroom closet framed in oak and the bathroom with shower and flooring installed.

    

 Bed and closet added to the bedroom and the kitchen counter installed.

Kitchen sink installed and later with the upper cabinets added.

The dinette and fridge.