Kits PAC School Renewal – Seismic Mitigation Committee



Check school http://kitsilano.vsb.bc.ca schedule or publications - newsletters for information on when the current school year's related meetings will be..



VSB Seismic Projects Update link http://www.vsb.bc.ca/schools/Seismic/default.htm




If you have questions or suggestions for the Kits PAC School Renewal - Seismic Mitigation Committee, or would like to volunteer, please contact this committee's Chair, James Burton at jburton@bwarc.ca.



LOG OF COMMITTEE ACTIVITIES ON SCHOOL RENEWAL - SEISMIC MITIGATION ISSUES




2009-10 Kits PAC



Link to Kits PAC info from the 2009-10 Kitsilano School Planning Team (KSPT)



Nov 17, 2009 Kits PAC meeting - Alex Grant, VSB Project Director, Facilities Initiatives, and former Kitsilano principal, addressed the PAC on 21st Century Learning Environments.



2009 October 15 from Kits PAC to Trustees Bacchus and Wong about Phase 2 of the school renewal project invite

2009 OCtober 15 from Kits PAC to Dale at  the VSB about Phase 2 of the school renewal project invite


2009 October 9  letter from Dale at the VSB to Kits PAC about Phase 2 of the school renewal project invite

From  Kits PAC e-news 2009 Oct 23

Seismic Mitigation Update

At our October 14 PAC meeting, Patti Bacchus, Vancouver Board of Education (VBE) Chair and liaison trustee for Kitsilano Secondary, outlined the proposed Project Charter for the second phase of Kitsilano's school renewal. CitySpaces Consulting, the same firm that helped facilitate last February's Visioning Event, has been engaged as Project Managers of this process.

In brief, there are three committees that will liaise with each other: the Kitsilano Concept Planning Steering Committee (KCPSC) as the Project Authority, comprising VBE senior management, Kitsilano Principal Chris Atkinson, and Earl Strueby, Planning Officer, Ministry of Education; the Kitsilano School Planning Team (KSPT) as Project Advisors, formed by Chris Atkinson, two PAC representatives, two Teachers, two Students, one Support Staff representative, and one member of the Planning Steering Committee; and the Project Consultant Team with CitySpaces and an architect, structural, electrical, mechanical and geotechnical engineers and a quantity surveyor. CitySpaces will also facilitate KSPT meetings.

A motion was passed that KitsPAC welcome the invitation to participate on the KSPT and recommend to the VBE that representatives from the Kitsilano community, the Vancouver Board of Parks and Recreation, and the City of Vancouver be included on the KSPT from the outset to ensure the efficiency of this second phase of Kitsilano's renewal.

To this end, KitsPAC has written to Mark Dale, Assistant Secretary of Treasurer - Facilities, as well as to Patti Bacchus and Allan Wong, Trustee and Chair of Committee II.

Two parent representatives were elected to the KSPT: James Burton, PAC Chair; and Jean Gordon, a parent of a Grade 8 student. The first meeting is on Thursday, October 29.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.





From the Kits PAC meeting minutes for 2009 Sep 15:

School Renewal / Seismic Upgrade – James Burton
-a school Visioning Workshop occurred in February over two days. Out of
workshop developed the Kits Pac vision document. All seismic-related
documents are on the school web site.
-current aim is to get the VSB to respond to the vision.
-arranging for Kitsilano Secondary’s VSB Trustee representative, Patti
Bacchus, to come to the next PAC meeting to provide an update on the
seismic issue.
-Committee II of the VSB currently meeting and making proposals regarding
Kits.
-currently Kits PAC has no Seismic Sub-Committee planned.



2008-9 Kits PAC School Renewal - Seismic Mitigation Committee



Following are the TENTATIVE dates for subsequent Kits PAC SRSMC meetings:

Tuesday, May 12th - assume not held as no notice sent out in Kits PAC e-news.
Tuesday, June 9th

All meetings are at 6:00 pm. All meetings are in the 3rd floor Staff Room.



From Kits school e-news May 15, 2009 and Apr. 20, 2009

KITSILANO SECONDARY SCHOOL SEISMIC INFORMATION UPDATE:

Parents and other members of the Kitsilano community who are interested in the information gathered from the Kits PAC School Renewal Seismic Mitigation Committee Survey can access the survey results and analysis at the following link:
http://members.shaw.ca/YHT99/Kits-PAC-SRSMC-2009-Feb-Initial-Survey-Info-Index.htm

CitySpaces’ summary report of the Visioning Event is available at this link:
http://kitsilano.vsb.bc.ca/downloads/SummaryofVisioningEvent.pdf

The Kits PAC summary presented to MLA Gordon Campbell and Committee II of the Vancouver Board of Education is available at this link:
http://members.shaw.ca/YHT99/Kits-PAC-campbell-26feb09.pdf




From Kits PAC e-news May 15, 2009

School Renewal - Seismic Mitigation News

The committee will report on the year's activities at the PAC AGM on Wednesday, May 20 where there also will be discussion on a Next Steps proposal. This would include developing an information package, composed of the Vision Document and links to documents produced by the committee this year, to update and gather support from our multiple political, educational, and community stakeholders. The Committee II, Planning and Facilities meeting minutes of April 7, where both the Kits PAC and the staff made presentations on the Visioning process, are now available at http://www.vsb.bc.ca/NR/rdonlyres/852DFCA4-C3CB-489B-871D-F30FC70FBF16/0/09April07op.pdf




Note: as the Apr. 21, 2009 PAC meeting ran long, agenda item 12. (seismic) was postponed to the next PAC meeting.

From Kits PAC e-news Apr. 20, 2009

PAC Meeting - Tuesday, April 21, 7pm

PAC Meeting Tuesday, April 21, 7:00 social; 7:30 business portion starts; 3rd floor staffroom

There's a lot happening, as we head into the homestretch of the school year.

Here is the proposed agenda:

1. Minutes of the last meeting
2. Principal's Report
3. Teacher's Report
4. Treasurer's Report
5. Dry Grad Update
6. Teacher Appreciation Lunch Organization
7. School Growth Plan / School Planning Council Update
8. Upcoming AGM
9. BCCPAC Election
10. New Technology Plan for Secondary Schools
11. Fundraising Goals for Next Year
12. School Renewal / Seismic update
13. Other Business

School Renewal/Seismic Mitigation Committee Update
Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.

There is an addendum to the PAC Survey that includes comments on the survey and additional information, at http://members.shaw.ca/YHT99/Kits-PAC-SRSMC-2009-Feb-Initial-Survey-Info-Index.htm

If you have any comments on the survey that you wish to have included in the addendum, please forward them to kitspac@hotmail.com

The facilitator's report on the Open Houses and the Visioning Event, which includes the PAC survey results, is now on the main page of the Kits website and available in pdf form at http://kitsilano.vsb.bc.ca/downloads/SummaryofVisioningEvent.pdf Comments are also being collected on this report and can be forwarded to kitspac@hotmail.com. In addition, a copy of the facilitator's report has been placed in the library for reference.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.




From the April 14, 2009 Kits PAC SRSMC  meeting:

The Kitsilano Parent Advisory Committee (Kits PAC) Survey 2009 February  report,  prepared as an addendum to the PAC survey included in the facilitator's report of the Kits Visioning Events, February 2009. Plans are for a copy of the facilitator's report to be in the Kits library.

http://members.shaw.ca/YHT99/Kits-PAC-SRSMC-2009-Feb-Initial-Survey-Info-Index.htm



VSB Committee II meeting minutes, see http://www.vsb.bc.ca/districtinfo/meetings/CommitteeMinutes/CommitteeII/default.htm

KIts PAC SRSMC presented  at the VSB Committee II meeting April 7, 2009. Information submitted to Committee II included :
-
the PAC Summary (agreed to at the Feb. 26 PAC meeting) and presented to our MLA, The Premier, on March 2, 2009
- the PAC survey and some selected information from the survey
- a script prepared by the Kits PAC SRSMC Chair. Not included in the script was alternate information provided by the teacher representative at the presentation.

At the Apr. 7, 2009 VSB Committee II meeting where Kits PAC SRSMC presented, there was information from the VSB that the BC MInistry of Education has provided funds for the VSB to hire two Project Director Facilities Initiative staff (one for secondary schools and one for elementary schools) to be education experts associated  with VSB wide seismic issues.

The Committee II, Planning and Facilities meeting minutes of April 7, where both the Kits PAC and the staff made presentations on the Visioning process, are now available at http://www.vsb.bc.ca/NR/rdonlyres/852DFCA4-C3CB-489B-871D-F30FC70FBF16/0/09April07op.pdf



From Kits PAC e-news 2009 Apr 7


Kitsilano Vision Presentation to Committee II - Tonight!

Planning & Facilities
Committee Room # 110, Vancouver School Board,
1580 West Broadway
Tuesday, April 7, 5:30 p.m.

A Kits delegation of PAC Executive members, Principal Alex Grant, staff representatives Julie Bond and Karen Coflin, and student representative M. Jaworski will make a brief presentation on Tuesday, April 7 to the VSB's Planning & Facilities Committee (Committee II). The PAC presentation will cover a description of the Visioning process, a screening of a short video that gives a taste of the Workshop, and, finally, the main points of the Vision Statement as endorsed by the PAC. The staff will also make a brief presentation. This is a public VSB meeting and all are welcome to attend, so please join us if you are able.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.
Visioning Process Feedback: Facilitator's Report & Survey Results

The PAC Executive and the School Renewal and Seismic Mitigation Committee welcome all feedback on the facilitator's report of the Kits Visioning Events, which includes the PAC Survey results. Given the size of the document, we are not able to post the file to our website. However, this report is now available at http://www.cityspaces.ca/projects/kitsilano, but only until Monday, April 13. Please take this opportunity to access the document. If you attended the Visioning Events and would like to comment on the report's findings, please forward your remarks to kitspac@hotmail.com. Comments will be collected until April 13 for consideration at the next School Renewal Seismic Mitigation meeting on April 14.



Note: re the above Apr. 7, 2009 PAC notice - there was agreement  at the Feb. 26 PAC meeting that information about the PAC survey, presented at the Feb. 26 PAC meeting, be included with the PAC survey in the Kitsilano Facilitator's Report (CitySpaces consultant's report), which was thought to be still in draft form. 

The above Apr. 7, 2009 PAC notice distributes the PAC survey in the Kitsilano Facilitator's Report without the agreed to information about the PAC survey. or notice that further information would follow.

Re the Feb. 26 PAC meeting, one piece of further information was
the different teachers result on a key survey issue. The conclusion after debate at that meeting was that:
- it was not appropriate to note the different teachers result in the PAC Summary for the meeting with the Premier
- that  the teacher difference was not to be dismissed, that it, together with the the other information presented, 
be included with the PAC survey in the Kitsilano Facilitator's Report (CitySpaces consultant's report), which was thought to be still in draft form. 

Related information from the Mar. 10 Kits PAC SRSMC meeting -  the Kitsilano Facilitator's Report (CitySpaces consultant report) can not be revised. An addendum will be prepared by the PAC to provide corrections and additional information such as the information presented at the Feb. 26 PAC meeting and the survey analysis.

For the further information to follow, see: http://members.shaw.ca/YHT99/K-PAC-SRSMC-2009-Feb-Initial-Survey.html



-----Original Message-----
From: Alex Grant [mailto:agrant@vsb.bc.ca]
Sent: Tuesday, April 07, 2009 11:04 AM
To: James Burton; W Family; chipman@highlatitude.com; jss97210@mac.com; tbwin@shaw.ca; cmarr@istar.ca; edgcumbe@shaw.ca; Andrew Larigakis; Larry Allen Benge; Tracy Monk; d.montgomery@telus.net; Julie Georgina Bond; Derek von Essen; George Bryce; ruby12@telus.net; Paige Axelrood; Ivet Bell; miki_mj@hotmail.com; Karen Gilmore; Jacqueline Stoeckler; Mary Chipman; Andrew Larigakis; cgoodban@shaw.ca; helen_m@shaw.ca; lherrera@shaw.ca
Subject: RE: Committee II presentation - Committee II meets at 5:30 in room 110 at the Education Centre (1580 West Broadway).  The Kits presentation is first on the Agenda - scheduled for 5:30 to 5:40.

Julie Bond and Karen Coflin will attend and participate in the presentation.  We have discussed the latest draft of the script that James provided and the teachers would prefer to express the Kits teachers' perspective directly, rather than have the PAC speak for them (as in section #4 of the draft).  I will also attend and will be pleased to share my perspective, if asked.

Regards,

Alex

Alex Grant
Principal
Kitsilano Secondary School
2550 West 10th Avenue
Vancouver, B.C.
V6K 2J6

604-713-8961

This email and any files transmitted with it are confidential and ntended solely for the use of the individual or entity to whom they are addressed.  If you have received this email in error, please delete this email from your system.

Please consider the environment before printing this e-mail notice

-----Original Message-----
From: James Burton [mailto:jburton@bwarc.ca]
Sent: April 7, 2009 8:17 AMTo: W Family; chipman@highlatitude.com; jss97210@mac.com; tbwin@shaw.ca;cmarr@istar.ca; edgcumbe@shaw.ca; Andrew Larigakis; Larry Allen Benge;Tracy Monk; d.montgomery@telus.net; Julie Georgina Bond; 'Derek von Essen'; George Bryce; ruby12@telus.net; Alex Grant; Paige Axelrood; Ivet Bell; miki_mj@hotmail.com; 'Karen Gilmore'; Jacqueline Stoeckler; Mary Chipman; Andrew Larigakis; cgoodban@shaw.ca; helen_m@shaw.ca; lherrera@shaw.ca

Subject: Committee II presentation

Hi everyone,  The PAC along with Staff and Student representation will make a brief presentation to the VSB's Committee II (which deals with facilities development) this evening.  The short message is to report on the Vision Document, to thank the VSB for their support, and to outline ways in which they can support the Vision and Staff.  < style="font-family: helvetica,arial,sans-serif;">Business commitments have meant that I cannot present to Committee II this evening, as originally planned. PAC Vice Chairs Lisa Herrera and Andrew Larigakis will present, along with (student) M. Jaworski and (teacher) Julie Bond.  If you wish to attend, contact the VSB for the meeting agenda and timing.  < style="font-family: helvetica,arial,sans-serif;">I look forward to hearing about the presentation.  And thank you in advance to the presenters.

James



From the BBC News website following the earthquake in Italy April 5, 2009:


** History of deadly earthquakes **
Hundreds of thousands of people have lost their lives to earthquakes in the last 100 years and improvements in technology have only slightly reduced the death toll.
< http://news.bbc.co.uk/go/em/fr/-/2/hi/in_depth/2059330.stm >



Draft meeting minutes Kits PAC SRSMC 2009 Mar 10

Note: the PAC Summary from the Feb. 26, 2009 extraordinary PAC meeting (described as the Visioning Proposal Document in the above draft minutes) is to be presented to the VSB's Committee II by the PAC Chair, the Kits Principal and a Kits teacher.  At the time of the Mar. 10 Kits PAC SRSMC meeting, it was thought that the VSB Committee II meeting would be April 2, 2009. Latest information is that meeting will be the week of April 6th.



From Kits PAC e-news 2009 Mar 9


School Renewal - Seismic Mitigation Meeting Tuesday, March 10, 6 p.m., Third Floor Staff Room

All are welcome to attend the School Renewal meeting this Tuesday. The proposed agenda is as follows:

1. Visioning Event follow-through
- thank you letters
- distributing the Report and the Vision Document
- video clip of the Visioning Event
- reporting to the VSB at Committee II
- archiving of Visioning event primary material in the Library

2. Meeting with the Premier
- report from delegation (Tracy, James, Andrew)

3. Next Steps
- contacting MP Joyce Murray regarding Federal funding
- PAC participation in Staff Visioning




From the extraordinary PAC meeting Feb. 26, 2009:

The PAC Summary (agreed to at the Feb. 26 PAC meeting) and presented to our MLA, The Premier, on March 2, 2009 by three PAC representatives (elected at the Feb. 26 PAC meeting). The three PAC representatives are James Burton, Andrew Larigakis and Tracy Monk.

There was agreement  at the Feb. 26 PAC meeting that information about the PAC survey, presented at the Feb. 26 PAC meeting, be included with the PAC survey in the Kitsilano Facilitator's Report (CitySpaces consultant's report), which was thought to be still in draft form.  Also agreed at the Feb. 26 PAC meeting, was the need to do further analysis of the PAC survey. Links for the Kitsilano Facilitator's report and drafts related to the information about the PAC survey and the analysis (including the initial survey results),



Information received from Mary Chipman (Mar. 26, 2009) that survey and Visioning outreach info was posted by student M. Jaworski on a Kits Facebook group in the run-up to the Feb. 2009 Open Houses and Visioning events. This information was received with a suggestion that the Kitsilano Facilitator's Report (CitySpaces consultant report) be posted
on the Kits Facebook group, as it is no longer available on the original link provided. (see above for new link available until April 8, 2009).

Update (April 2, 2009) - Mary is looking into the possibility of the  Kits school library holding a copy of the Facilitator's Report



From Kits PAC e-news Feb. 26, 2009

Extraordinary PAC Meeting tonight

6 p.m., 3rd floor staff room

A reminder to all that there is a special PAC meeting tonight at 6 p.m. to discuss the Kits Vision in preparation for the upcoming meeting with Gordon Campbell.

Also, the CitySpaces  report on the Open House and the Visioning Workshop is available for download at http://cityspaces.ca/projects/kits_secondary/    (no longer working, see above for new link available until April 8, 2009)




Draft meeting minutes Kits PAC SRSMC 2009 Feb 24



From: Alex Grant [mailto:agrant@vsb.bc.ca]
Sent: Tuesday, February 24, 2009 12:01 PM
To:  Kits PAC SRSMC
Subject: RE: For Discussion
 

Hi James,


Your message below did not contain the link to the report – I have included it in this message:


The CitySpaces summary report for the Kits Visioning Event is complete and available for download from our ftp site:


http://cityspaces.ca/projects/kits_secondary/
  (no longer working, see above for new link available until April 8, 2009)
 
The file is in compressed PDF format but, at 7.5 MB and 80 pages, is still a large file.


I will bring a copy, but it will be challenging to have a meaningful discussion with participants who have not pre-read the report.


Regards,


Alex


Alex Grant

Principal

Kitsilano Secondary School
2550 West 10th Avenue
Vancouver
, B.C.
V6K 2J6

604-713-8961

 This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed.  If you have received this email in error, please delete this email from your system.

P Please consider the environment before printing this e-mail notice


From: James Burton [mailto:jburton@bwarc.ca]
Sent: February 24, 2009 10:37 AM
To: Kits PAC SRSMC
Subject: Re: For Discussion

Please note that if you receive this message, but not an earlier email with the CitySpaces report, it is because your mailbox could not receive the earlier email due to the size of the report attachment.  

Alex, I suppose we should have a few copies printed for people to share Tuesday night.

I’ve received this from Elizabeth of CitySpaces.  It would be great if we could all review ahead of tomorrow’s (Tuesday’s) meeting at 6:00 pm.

James



From Kits PAC e-news Feb. 24, 2009

School Renewal - Seismic Mitigation Committee Meeting: Tuesday, Feb. 24, 6 p.m., 3rd floor staff room

Thank you to all those who participated in the Open House and Vision Workshop just over a week ago. Many innovative ideas were generated and it was wonderful to see all our community working together to create a Vision for Kits that enhances learning and social interaction.

In this post-Visioning phase we must act quickly to draw up our Vision for Kits for presentation to Gordon Campbell in early March. We welcome all to these extremely important meetings.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.

+++

*****Extraordinary PAC Meeting******

Please join us for this meeting which will review the survey, Open House and Workshop outcomes, and identify tasks to help articulate a Vision for Kits to be brought to the PAC for ratification on Thursday, Feb. 26.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.



Feb. 22, 2009 notice posted to this web log re:

 - 6:00 pm Tuesday Feb. 24th, 2009 3rd floor staff room, Kits PAC School Renewal Seismic Mitigation Committee  meeting
All PAC members welcome.

Review of survey and Workshop outcomes,
Identification of tasks for articulation of Vision for Kits, to recommend to PAC for ratification on Thursday.

- 6:00 pm Thursday Feb. 26th, 2009 3rd floor staff room, PAC extraordinary meeting
Ratification of Vision for Kits, for meeting with Premier Campbell.



From Kits school e-news Jan. 30, 2009:

Dear Kitsilano Secondary School Parents/Guardians:

Kitsilano Secondary - Be Part of the Vision!

http://kitsilano.vsb.bc.ca/downloads/090128_KITS_POSTER_B.pdf

or

http://members.shaw.ca/YHT99/Kits-PAC-2009-Feb-Seisimic-Visioning-Open.pdf

or

http://members.shaw.ca/YHT99/Kits-PAC-2009-Feb-Seisimic-Visioning-Open-colour.pdf

The Kitsilano Secondary School Parent Advisory Council (Kits PAC) wishes to engage you and seeks your opinions in creating a vision for the seismic upgrading and school renewal of Kitsilano Secondary School. With the cooperation and support of the school and the Vancouver Board of Education, we have developed three ways for you to participate in this exciting prospect - A Visioning Workshop, an Open House, and a Survey – choose one, two, or all three!

(1) Visioning Workshop
Visioning Workshop
Saturday, February 14, 2009
9:30 a.m. to 3:30 p.m.
Kitsilano Secondary Gymnasium,
2550 West 10th Avenue

Kitsilano Secondary is due for seismic upgrading — an extraordinary opportunity to rethink our school buildings and site, and bring innovation to learning. Kitsilano is your neighbourhood school. Help us chart our future by attending this workshop with featured speakers and facilitated break-out sessions.

Seismic safety, sustainability, and heritage are all issues that we must address as a community to prepare our school, neighbourhood and learning network for the needs of the future. Bring us your vision for Kits!

Please indicate your interest by registering for the free Visioning Workshop at kitssecondary@cityspaces.ca  or call 1.866.383.0304 ext. 32

(2) Open House
Busy? Need more info?
Come to our Open House on Friday, February 13, 7 - 9 p.m. or Saturday, February 14, 9:30 a.m. - 3:30 p.m. in the gym

(3) Survey
You are also invited to participate in our public opinion survey at the following link:
http://www.surveymonkey.com/s.aspx?sm=TYzjYPFb3d1VB7F_2fGrAAUQ_3d_3d

Please complete the Survey prior to February 15th (the survey is short and only takes 5 minutes to complete).

Thank you for your participation!

James Burton
PAC Chair

Alex Grant
Principal



From Kits PAC e-news Jan. 19, 2009

Kitsilano Secondary Seismic Upgrade/School Renewal Survey
Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.

The Kitsilano PAC and its School Renewal-Seismic Mitigation Committee have developed a survey to start the process of gathering as much data as possible into the views and ideas that the Kits community has regarding the options of school renewal and seismic mitigation for Kitsilano Secondary. This survey is being distributed to all Kits stakeholders; from our representatives at the federal, provincial, municipal, and school district levels to business and residential associations, alumni, and community groups, in addition to our Kits school community of staff, students, and parents.

Let your voice be heard! Follow this link and take this very brief survey at http://www .surveymonkey.com/s.aspx? sm=TYzjYPFb3d1VB7F_2fGrAAUQ_3d_3d

Please encourage every member of your family, including your student(s), to take this survey. Spread the word to your neighbours, family, friends, and business associates in Kits. The deadline for survey submissions is February 15.

Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.

Re-Vision Kitsilano Secondary - What is your dream school?
Right-click here to download pictures. To help protect your privacy, Outlook prevented automatic download of this picture from the Internet.

Open House: Friday, February 13, 7:00 - 9:00 p.m. Kits Gym - Drop in

Visioning Event: Saturday, February 14, 9:30 a.m. - 3:30 p.m. (includes lunch) Kits Gym - Registration required; details to follow.

Kitsilano Secondary is hosting "Re-Vision Kitsilano Secondary - What is your dream school?", a major brainstorming event for all of Kitsilano, in collaboration with the VSB and facilitated by CitySpaces Consulting. The objective is to have wide participation from all our stakeholders to creatively elaborate what our ideal neighbourhood school is and what it might look like as we enter the school renewal-seismic mitigation process. Join us for the Open House on Friday, February 13, and Saturday, February 14 for what will be an inspiring and informative workshop.



From: James Burton [mailto:jburton@bwarc.ca]
Sent: Monday, February 09, 2009 8:31 AM
To: Kits PAC SRSMC
Subject: Premier Campbell - correction to meeting time: March 2nd

 

Hi everyone,

I got a call from the Premier's constituency office, saying the Premier Campbell is NOT able to attend the upcoming Visioning Workshop and Open House events.

He has, however, tentatively scheduled a meeting for 9-10:30 am March 2nd, to receive our report.  He has requested that because of the short time available, we be a small delegation (three at the most) to convey the results of Kits' visioning event.

James




From:
James Burton [mailto:jburton@bwarc.ca]
Sent: Thursday, February 05, 2009 4:03 PM
To: Kits PAC SRSMC
Subject: FW: SOS

Hi everyone.

Attached is the Statement of Significance for Kitsilano, released by the VSB.

Basically, a statement is a technical tool - just like a structural survey of a building is a technical tool that tells you about a particular aspect of the building.  It should summarize why the building and site are considered important to us today, and list the physical elements that convey that importance.  Statement can also be used as a reference when drawing up a plan for the conservation of parts of the building and site.

James

Statement of Significance



Kits PAC SRSMC draft meeting minutes Feb. 3, 2009 not yet  posted



Kits PAC SRSMC draft meeting minutes Jan. 27, 2009 not yet  posted

Agenda was to review the Visioning Subcommittee's work with CitySpaces consulting on the planning of the Visioning Event, scheduled to be held on Saturday, February 14, 2009



2009 Jan. 15

A process for involving students in the seismic renewal project has begun with the help of the new consultants. The process is described in
the Kits PAC meeting 2009 Jan 14 minutes.



Kits PAC SRSMC draft meeting minutes Jan. 14, 2009




From Kits PAC e-news Jan. 13, 2009

School Renewal - Seismic Mitigation Committee Meeting: Wednesday, January 14, 6 p.m., 3rd floor Staff Room

CitySpaces Consulting will be meeting with the committee to discuss organizing the visioning workshop "What is your dream school?"

PAC General Meeting: Wednesday, January 14, 7 p.m.

PAC General Meeting: Wednesday, January 14, 7 p.m. Refreshments; 7:30 business meeting starts; 3rd floor Staff Room

Please join us for this all- important meeting that will focus on discussing the organization of the upcoming visioning workshop for all Kitsilano community stakeholders including VSB staff, faculty, students, parents, alumni, residents, businesspeople, as well as municipal, provincial and federal political representatives. Originally, this workshop "What is your dream school?" was slated for mid-January. However, over the holidays, the VSB hired CitySpaces Consulting to help us with implementing and facilitating the workshop, which now will take place in February, in light of the scope of the project.

The PAC Agenda is as follows:

1. Planning for the Visioning Workshop, including introduction of CitySpaces.
2. Business Items - Review of previous minutes, Business Arising, Principal's Report, Teacher's Report, Treasurer's Report




Kits PAC SRSMC draft meeting minutes Jan. 7, 2009




2008-9 Kits PAC School Renewal - Seismic Mitigation Committee (September through December)



2007-8 Kits PAC School Renewal - Seismic Mitigation Committee ( February through June)



2007-8 Kits PAC School Renewal - Seismic Mitigation Committee (September through January)



K-PAC Seismic Safety 2006-7 and before